Consumption Analysis
Twelve months of HT/LT billing data, maximum demand, power factor, shift patterns and seasonal variation — the basis for capacity sizing.
Large-scale solar for factories, manufacturing units, warehouses and industrial facilities across India — engineered capacities from 100 kW to 2 MW.
For an energy-intensive plant, electricity is not an overhead — it is an input cost that shows up in the price of everything you make. Solar at industrial scale is a way to fix part of that input cost for the next two decades.
Industrial projects differ from rooftop residential work in almost every respect: the structures are larger and older, the electrical infrastructure is HT rather than LT, the approvals are more involved, and the consequences of a poor design are measured in lost production. They are run as engineering projects, with a schedule and defined milestones.

Twelve months of HT/LT billing data, maximum demand, power factor, shift patterns and seasonal variation — the basis for capacity sizing.
Roof or shed condition, purlin spacing, load-bearing capacity and wind loading, so the mounting system is safe for the design life of the plant.
Single-line diagram, string and inverter configuration, protection coordination, earthing and lightning protection appropriate to the connection voltage.
DISCOM approval route, permitted capacity against sanctioned load, metering arrangement and electrical inspectorate clearance where applicable.
Sequencing around plant operations, material delivery, manpower and defined milestones so production disruption is minimised.
Maintenance schedule, cleaning cycles appropriate to industrial dust conditions, and performance review after commissioning.
Industrial solar decisions are made on numbers, not brochures. Share your consumption data and site details and we will assess whether the project is viable, at what capacity, and what it would take to execute.
Where a project is not viable — because of roof condition, shading, regulatory caps or load profile — we will say so. That is more useful to you than a proposal that cannot be delivered.
Applicable incentives, open-access provisions and metering policies for industrial consumers vary by state and change over time. The residential PM Surya Ghar subsidy scheme does not apply to industrial installations.
Tell us your monthly consumption, plant location and available roof or land area.
From a 100 kW shed roof to a 2 MW multi-unit campus — start with a conversation about your consumption data.